High Pressure Pneumatic Pump

High Pressure Pneumatic Pump

CZPT Parameter of CZPT
 

Type Strain ratio Min. Fuel Inlet Force PA(bar) Max. Gas Inlet Stress PA(bar) Max. Authorized Outlet Strain PB(bar) Outlet Stress Determine Formulation PB Gas Inlet Gasoline Outlet Max. Movement Ln/min @PL=6bar
OMD10 ten:1 5 bar eighty bar 80 bar 10PL+PA ZG1/4” ZG1/4” 372@PA=6
OMD25 25:1 10bar 200bar 200bar 25PL+PA ZG1/4” ZG1/4” 154@PA=twenty
OMD40 40:1 15bar 320bar 320bar 40PL+PA ZG1/4” ZG1/4” 92@PA=20
OMD60 sixty:1 25bar 480bar 480bar 60PL+PA ZG1/4” ZG1/4” 115@PA=40
OMD100 one hundred:1 35bar 800bar 800bar 100PL+PA ZG1/4” ZG1/4” 74@PA=40

Merchandise introduction

This series of pump has solitary stage. To get to the required force, the enter fuel should be pressurized to some degree in progress. The pre-including force is different according to the essential optimum stress. The maximum strain can be up to 80Mpa. The reversing way of OMD-Collection is the identical as that of OMA-Sequence, but OMD-Sequence has double pump heads, which is made based on OMA-Collection. The pump is made of aluminum alloy and stainless steel. The diameter of its generate piston is 160mm, push fuel pressure≤8bar. Each pump heads can awesome the exhaust fuel. The pipelines which link the two inlets and two shops will be concluded according to customers’ requirements ahead of they go away the manufacturing unit.

Our manufacturing facility

FAQ

one. Shipping CZPT: FOB HangZhou, by vessel
two. Supply Time: 15-20 days
three. Payment CZPTs: T/T (a hundred% to pay out by T/T )
four. Set up / Procedure / Support / Guide: In English
5. Guarantee: 1 calendar year from the day of completion of the commissioning.
six. Pre-cargo Inspection: Provider need to trial run complete line at supplier’s manufacturing unit just before shipment.

About transport

Fumigation wooden instances, which are effectively sealed and strong adequate for long-time period vacation, and appropriate for multi-moments loading & unloading by forklift.

 

High Pressure Pneumatic Pump