CZPT Parameter of CZPT
Type | Force ratio | Outlet pressure | Flow 1/Min |
Connections | Net fat KG |
|||
bar | psi | CZPT port | Inlet | Outlet | ||||
OG6 | six:1 | forty eight | 696 | 27.seventy four | G1/2” | G3/4” | ZG1/2” | twelve.seven |
OG10 | ten:1 | 80 | 1160 | 18.five three | G1/2” | G3/4” | ZG1/2” | 12.7 |
OG16 | sixteen:one | 128 | 1856 | 12.86 | G1/2” | G3/4” | ZG1/2” | 12.7 |
OG28 | 28:one | two 24 | 3248 | 7.24 | G1/2” | ZG1/2” | ZG3/8” | 12.two |
OG40 | forty:one | three 20 | 4640 | five.02 | G1/2” | ZG1/2” | ZG3/8” | 12.two |
OG64 | sixty four:one | 512 | 7424 | three.21 | G1/2” | ZG1/2” | ZG3/8” | 12.two |
OG80 | eighty:1 | 640 | 9280 | 2.forty four | G1/2” | ZG1/2” | ZG3/8” | 12.two |
OG100 | 100:1 | 800 | 11600 | one.eighty one | G1/2” | ZG1/2” | M14X1.five | 12 |
OG130 | one hundred thirty:one | 1040 | one hundred fifty 80 | one.36 | G1/2” | ZG1/2” | M14X1.5 | 12 |
OG175 | one hundred seventy five:one | 1400 | 20300 | 1.fourteen | G1/2” | ZG1/2” | M14X1.five | 12 |
OG255 | 255:1 | 2040 | 29580 | .77 | G1/2” | ZG3/8” | M14X1.five | twelve |
OG400 | four hundred:one | 3200 | 46400 | .51 | G1/2” | ZG3/8” | M14X1.five | 12 |
Item introduction
This sequence of pump utilizes single pneumatic non-equilibrium gasoline distributing valves to shift to and fro instantly. The travel elements of the pump are produced of aluminum alloy. These areas are taken care of with oxidation into black to ensure their very good-hunting visual appeal and stainless performance.
The fluid making contact with components are made of carbon steel or stainless steel according to various media. The complete established of sealing areas is imported, to making certain pumps’ performances. The diameter of generate piston is 100mm. The highest push pressure is 10bar. We suggest clients use air pressure≤8bar to make certain prolonged lifespan of the pump.
Main complex data
Our factory
FAQ
1. Supply CZPT: FOB HangZhou, by vessel
2. Shipping Time: fifteen-20 days
three. Payment CZPTs: T/T (one hundred% to pay out by T/T )
4. Set up / Procedure / Support / Handbook: In English
five. Guarantee: One calendar year from the day of completion of the commissioning.
6. Pre-shipment Inspection: Supplier need to trial run whole line at supplier’s manufacturing facility ahead of cargo.
About transport
Fumigation picket cases, which are nicely sealed and sturdy sufficient for prolonged-term excursion, and suitable for multi-instances loading & unloading by forklift.